See today’s confirmed same-day availability, or text (469) 253-2403 for instant pricing
Fill Dirt Near Me

Fill Dirt for Permitted Projects

Grading, demolition, foundation, and new-construction permits almost always mean moving earth. If your project needs clean fill, structural fill, or backfill, tell us the details and we'll send delivery options and pricing.

Tell us about your project

One quick form. A real person reviews it and follows up. We never share your info.

We'll use your details only to prepare a quote. No spam.

Do You Even Need a Permit for Fill Dirt?

Permit rules vary a lot by state and even by city. Pick your market below.

Texas / DFW

The answer depends on how much fill, where you're putting it, and what city you're in.

One of the first questions homeowners ask before ordering fill dirt is whether they need a permit. In Texas, the answer depends on your city, the volume of fill, the depth of grade change, and whether your property is in a floodplain or near a waterway. Here is a city-by-city breakdown for the DFW metro area, along with general rules that apply statewide.

General Rule for Texas

Most residential fill dirt projects that change the grade by less than 2 feet do not require a permit in Texas. If you are filling a low spot in your yard, adding topsoil for a new lawn, or backfilling a small trench, you are almost certainly fine without a permit. However, commercial projects almost always require grading permits regardless of depth, and any work in a floodplain requires permits and often engineering review. When in doubt, call your city's building inspection or development services department before ordering material.

Dallas

The City of Dallas requires a grading permit for residential projects involving more than 50 cubic yards of fill or any project that changes existing drainage patterns. If your project is under 50 yards and does not redirect water onto a neighbor's property, you generally do not need a permit. For commercial projects, a grading permit is required for any earthwork regardless of volume. Dallas also requires erosion control measures (silt fence, inlet protection) on projects over 1 acre. You can verify requirements and apply through the Dallas Building Inspection department.

Important note for Dallas: if your property is in a FEMA-designated floodplain (common near the Trinity River, White Rock Creek, and Five Mile Creek), you need a floodplain development permit for any fill placement, regardless of volume. Placing fill in a floodplain without a permit can result in fines of $500–$2,000 per day and a requirement to remove the fill at your expense.

Fort Worth

Fort Worth requires a development permit for grading that raises or lowers the existing grade by more than 1 foot in residential areas. Smaller projects (leveling a yard by 6–8 inches, adding topsoil, filling a small hole) typically do not need a permit. Commercial grading always requires a permit and usually a grading plan prepared by a licensed engineer. Fort Worth is particularly strict about stormwater management, so any project that could affect drainage needs to be reviewed. Check the Fort Worth Development Services page for current requirements and online permit applications.

Arlington

Arlington requires a fill permit when the grade change exceeds 18 inches anywhere on the property. For projects under 18 inches of grade change, residential properties generally do not need a permit as long as the fill does not alter drainage to adjacent properties. Arlington also requires a separate erosion control plan for disturbed areas over 5,000 square feet. The city's development services team can be reached at (817) 459-6500, and permit applications are available through the Arlington permits portal.

Plano

Plano requires a grading permit for fill placement exceeding 2 feet in depth on residential properties. Projects under 2 feet generally do not need a permit, but Plano has strict rules about maintaining existing drainage patterns. If your fill project would direct stormwater onto a neighboring property that did not previously receive it, the city can require you to remove the fill and restore the original grade, even if the depth was under the permit threshold. Plano's Engineering department handles grading permits and can advise on specific situations.

When You Always Need a Permit

Regardless of which city you are in, certain situations always require permits and often additional engineering review:

Floodplain properties: Any fill placement in a FEMA-designated floodplain requires a floodplain development permit. This applies to every city in Texas. Floodplain fill without a permit is a serious violation that can affect your property's flood insurance, your neighbors' flood insurance, and your liability for downstream flooding.

Near waterways: If your property borders a creek, river, lake, or drainage channel, additional setback and environmental review requirements apply. The U.S. Army Corps of Engineers may also have jurisdiction under Section 404 of the Clean Water Act if the waterway is classified as "waters of the United States."

Commercial property: Commercial grading projects require permits in every DFW city, regardless of volume or depth. You will also typically need an engineered grading plan, erosion control plan, and stormwater pollution prevention plan (SWPPP).

Grade changes over 2 feet: Any project that changes the grade by more than 2 feet is likely to require a permit in every Texas municipality, even for residential properties.

When You Do NOT Need a Permit

These common residential projects typically do not require permits in most DFW cities:

Garden beds and landscaping: Adding topsoil to flower beds, building raised garden beds, and general landscaping with less than 18 inches of grade change.

Small yard leveling: Filling low spots, smoothing out uneven areas, and general grading under 50 cubic yards with less than 12 inches of grade change.

Driveway base: Placing base material under a driveway extension where the grade change is under 18 inches, though you may need a separate driveway permit for the actual paving.

Pool backfill (residential): Most cities treat pool removal and backfill as a demolition project rather than a grading project. You will need a demolition permit for the pool removal, but the fill itself is typically covered under that same permit.

How We Help

We deliver fill dirt. We do not handle permits. But we have delivered thousands of loads across DFW and know which projects typically trigger permit requirements. If you text us at (469) 253-2403 with your project details, we can tell you whether similar projects in your city have needed permits in our experience. We always recommend verifying with your city's building department for your specific situation, but we can point you in the right direction and save you time.

Colorado / Denver Metro

Grading permits along the Front Range are mostly administered by county, not city, and several cities publish no small-residential threshold at all. Here is what's actually confirmed, city by city.

Whether you need a permit before having fill dirt delivered in the Denver metro depends less on a single statewide rule and more on which city or county has jurisdiction over your address, and that jurisdiction varies more in Colorado than it does in most states, because several well-known "suburbs" (Highlands Ranch, unincorporated parts of Jefferson and Arapahoe counties) have no city government of their own. Below is what we could verify directly from city and county sources, and, just as important, which cities publish no small-residential threshold at all, so you know when to call ahead rather than assume.

Statewide Rule: The 1-Acre Stormwater Trigger

Regardless of which city or county you're in, the Colorado Discharge Permit System (CDPS) General Permit (COR400000), administered by the Colorado Department of Public Health and Environment (CDPHE), requires stormwater permit coverage for any construction activity disturbing 1 acre or more of land, including smaller sites that are part of a larger common development plan totaling an acre or more. This is separate from, and in addition to, any local grading permit. Most residential fill-dirt deliveries (yard leveling, foundation backfill, a pool fill) fall well under an acre of disturbance, but subdivision-scale grading does not.

FEMA-mapped 100-year floodplain fill also triggers a local Floodplain Development Permit statewide, enforced by whichever city or county is the floodplain administrator for that parcel. If your property borders a creek, the South Platte, or any mapped drainageway, check this before ordering fill regardless of volume.

Boulder (City)

The City of Boulder requires a grading permit for any cut or fill exceeding 50 cubic yards, with no published small-residential exemption below that. Boulder also requires a Floodplain Development Permit for any fill placement inside the FEMA floodplain, independent of volume. Contact Boulder's Planning & Development Services before ordering material near that threshold.

Boulder County (Unincorporated)

Outside Boulder's city limits (including many outlying properties near Longmont, Lyons, and Niwot), Boulder County uses a tiered system: 50 cubic yards or less requires no review; between 50 and 500 cubic yards requires an Expedited Site Plan Review plus a Grading Permit; 500 cubic yards or more requires a Limited Impact Special Use Review plus a Grading Permit. These thresholds are cumulative per parcel, not per delivery. Boulder County Community Planning & Permitting: (303) 441-3930.

Jefferson County (Unincorporated)

For unincorporated Jefferson County properties (relevant if your address is near, but not inside, Lakewood, Arvada, or Golden city limits), a grading permit is required once disturbance exceeds 0.5 acre (21,780 sq ft), and stockpiling 5,000 cubic yards or more of unused material also triggers a permit on its own. Disturbance over 1 acre additionally triggers the state CDPHE stormwater permit described above. New single-family homes with driveway disturbance under 0.5 acre can typically use a simplified Notice of Intent instead of a full permit. Jefferson County Engineering & Earthwork: (303) 271-8700.

Broomfield

Broomfield is both a city and a county, so one department handles both. Grading over 5,000 cubic yards triggers additional requirements under IBC Appendix J, and permit fees are tiered by cubic yardage well below that threshold. There is no published small-residential exemption. Broomfield Engineering Division: (303) 438-6380, engineeringpermits@broomfield.org.

Arapahoe County (Unincorporated)

For unincorporated Arapahoe County (relevant near Centennial), a standard Grading/Erosion/Sediment Control (GESC) Permit is required for land-disturbing activity per the county's GESC Manual, with a "Low Impact" GESC Permit available where disturbance is under 1 acre. We could not verify a specific small cubic-yard exemption on the county's own site. Treat any number you see elsewhere online for Arapahoe County as unconfirmed until you check with the department directly. Arapahoe County Engineering Services: (303) 795-4400.

Aurora

Aurora requires a stormwater quality/erosion-control permit before any site disturbance that removes vegetation, regardless of volume. A narrower 50-cubic-yard exemption exists in Aurora's code, but it applies specifically to gravel-extraction and mineral-exploration activity. Don't assume it extends to general residential fill. Aurora Permit Center: (303) 739-7420.

Parker

Parker requires a grading permit under Municipal Code Chapter 11.10 for qualifying earthwork. We were not able to confirm a specific cubic-yard threshold from a machine-readable source, so if your project is more than a small yard-fill, call ahead. Parker Public Works: (303) 840-9546.

Denver, Lakewood, Arvada, Westminster, Thornton, Centennial, Highlands Ranch/Douglas County, Longmont, Castle Rock, Commerce City, Littleton, and Golden

We could not find a publicly published small-residential cubic-yard exemption for any of these jurisdictions. That doesn't necessarily mean no threshold exists: it means it isn't published in a form we could verify, so we're not going to guess at a number. You'll see a "300 cubic yards / 3 feet" figure repeated on some secondary sources for Denver-area cities; that number comes from the baseline IBC Appendix J model code language, not a confirmed local amendment, so don't rely on it without checking your city's actually-adopted grading ordinance. If your project is a small residential yard-leveling or backfill job, it's very likely exempt from formal review everywhere on this list, but for anything approaching 50+ yards, foundation-adjacent work, or floodplain-adjacent property, call your city's building or engineering department before ordering.

Highlands Ranch is a special case worth calling out again: it has no independent city government, so permits go through Douglas County Community Development rather than a "Highlands Ranch" building department.

What This Means If You're Just Leveling a Yard

The overwhelming majority of residential deliveries we make across the Denver metro (yard leveling, foundation backfill after a repair, a pool fill) are well under every threshold listed above, city or county. Permits become a real question at commercial scale, subdivision grading, anything near a mapped floodplain, or projects pushing past 50 cubic yards in Boulder-area jurisdictions specifically. When in doubt, a two-minute call to your city or county's building/engineering department before you order saves a lot more time than finding out after the fact.

How We Help

We deliver fill dirt. We don't issue or track permits. But we've delivered across every jurisdiction on this list and can tell you whether a project like yours typically needs one in our experience. Text us at (720) 577-5016 with your project details and city, and we'll point you toward the right department if you're not sure. Always confirm the final answer with your specific city or county. This article reflects what each jurisdiction had published as of August 2026, and local codes do change.

Prefer to text?

Send your project details and get a quote in minutes.

Text (469) 253-2403

Your project starts with
the right dirt.

Text us what you need. Quoted in minutes. Delivered in hours.

Text for instant quote

Mon–Sat 7am–5pm · Responses in minutes