See today’s confirmed same-day availability, or text (469) 253-2403 for instant pricing
Fill Dirt Near Me

Dirt Delivery Fees Explained: How to Compare Quotes Apples to Apples

Updated November 2026

Short answer: a bulk dirt quote has two parts: the material price (per yard or per ton at the pit) and the delivery charge, which national guides typically put at $50 to $150 per trip for loads up to about 15 yards, more for long hauls. Some suppliers also add short-load fees, fuel surcharges or distance zones. The only fair comparison is total delivered cost divided by yards delivered. Our published prices are delivered per-yard prices, starting at $10 per yard for fill dirt in DFW.

What is the difference between material price and delivery fee?

The material price is what the dirt costs at the pit or yard. The delivery fee pays for the truck, the driver, fuel and the time from loading to dumping and back. On cheap materials like fill dirt, delivery is often the larger share of the bill. That is why a "$5 a yard" price can turn into $25 a yard on a small order.

Quote lineWhat it coversTypical market practice
MaterialThe dirt itself, at the pitPer yard or per ton
Delivery / haul feeTruck, driver, fuel, timeFlat per trip, often $50–$150; higher by distance
Short-load feePartial loads below the truck minimumVaries by supplier
Fuel surchargeFuel price swingsSome suppliers, percentage or flat
Distance zoneLong haulsHigher delivery charge beyond a set radius
Spreading / gradingLabor to spread the pileSeparate; often $200–$400 for a residential spread

Market practices above are typical ranges from national cost guides, not any specific company's prices.

Why do suppliers have order minimums?

A truck costs about the same to run whether it carries 3 yards or 10. Minimums make sure each trip covers its cost. Our minimum is 10 yards, one tandem load. Suppliers who allow smaller orders usually recover the cost through a short-load fee or a higher per-yard price on small orders.

What is a short-load fee?

A short-load fee is a surcharge for ordering less than a truck's normal minimum. It is common in ready-mix concrete and in some aggregate yards. If a quote looks cheap per yard but you are ordering only a few yards, ask whether a short-load charge applies. Often, ordering a full load costs nearly the same as a short load plus the fee.

How does distance change the price?

Haul distance is the biggest variable in delivery cost. Each extra mile adds fuel and driver time both ways. Suppliers handle this in different ways:

  • Flat fee within a radius, with a higher fee beyond it.
  • Per-mile or zone pricing that rises as you get farther from the pit.
  • Delivered per-yard pricing, where delivery is built into the per-yard price.

None of these is automatically better. What matters is the final delivered number for your address.

Why quote delivered price per yard?

A delivered per-yard price answers the question buyers actually have: "what will this cost me at my site?" It removes the separate trip fee from the math and makes two quotes directly comparable. Our published prices work this way: fill dirt starts at $10 per yard delivered in DFW and $15 in Denver; screened topsoil $17 / $22; structural or select fill $20 / $25; sand $22 / $27; gravel $25 / $30. A 10-yard load of fill in DFW starts at $100.

How do I compare dirt delivery quotes apples to apples?

Put every quote on the same basis with these steps:

  1. Confirm the unit. Yards or tons? Convert tons to yards with the material weight (fill dirt about 1.2 tons per yard). The tons to cubic yards calculator does it for you.
  2. Confirm the material. Screened or unscreened? Common fill or select fill? A cheaper quote for a lower grade is not a cheaper quote.
  3. Add every fee. Delivery, short-load, fuel, zone, and any spreading you want.
  4. Divide by yards delivered. That is your true delivered price per yard.
  5. Check the load size. "One load" from a 5-yard truck and "one load" from an 18-yard truck are very different amounts.
ExampleQuote AQuote B
Material10 yd at $6/yd = $6010 yd delivered at $12/yd
Delivery fee$100Included
Total$160$120
Delivered price per yard$16/yd$12/yd

The example uses round illustrative numbers. The point stands for any quote: the lowest material price is not always the lowest delivered price.

What questions should I ask before ordering?

  • Is delivery included, and is there a fuel or distance charge for my address?
  • What is the minimum, and is there a short-load fee below it?
  • How many yards does the truck actually carry?
  • Is the material screened, and where does it come from?
  • Is spreading included, or is it a pile?
  • What happens if the truck cannot reach the dump spot?

How to vet a fill dirt delivery company covers the rest of the checklist, and first time ordering dirt delivery walks through the process.

What about hauling dirt away?

Haul-off is the reverse trip and follows the same logic: a truck, a driver and a place to dump. We do dirt haul-off as part of our dirt hauling service, and for loads you move yourself, free dumpsites lists places that take clean fill.

Red flags in a dirt quote

  • No unit stated. "$150" for "a load" means nothing until you know how many yards.
  • Price by the ton on wet material with no moisture discussion. You pay for water weight.
  • Vague material description like "dirt" or "fill" with no word on screening or source.
  • Fees disclosed only after the truck shows up. Ask for every charge in writing before scheduling.
  • A price far below the local market with no explanation. Cheap fill from an unknown source can cost more later if it is full of debris.

Does it matter whether the price is per yard or per ton?

It matters for comparison, not for fairness. Yards measure volume; tons measure weight. Contractors usually order by the yard because projects are measured in volume. Pits and quarries often sell by the ton because they load over a scale. To compare, convert using typical weights: fill dirt about 1.1 to 1.3 tons per yard, screened topsoil about 1.0 to 1.1, sand about 1.3 to 1.5, and gravel about 1.4 to 1.5. A $15 per ton price on gravel is roughly $21 to $23 per yard before delivery.

MaterialTons per yd³$10/ton equals about
Fill dirt1.1–1.3$11–$13/yd
Screened topsoil1.0–1.1$10–$11/yd
Sand1.3–1.5$13–$15/yd
Gravel1.4–1.5$14–$15/yd

Get a delivered number

Figure your yardage with the fill dirt calculator or the cubic yards calculator, then text the material, yards and address. DFW and Texas: text (469) 253-2403. Denver: text (720) 577-5016.

Need Fill Dirt Delivered?

Text us your project details for a quote in minutes.

Text for Instant Quote

Frequently Asked Questions

Suppliers that bill delivery separately typically charge about $50 to $150 per trip for loads up to around 15 yards, more for long hauls. Our published prices include delivery in the per-yard price.

A short-load fee is a surcharge some suppliers add when you order less than a truck's normal minimum. A full load often costs about the same as a short load plus the fee.

Add the material, delivery and any other fees, then divide by the yards actually delivered. That delivered price per yard is the only fair comparison.

Our minimum is 10 cubic yards, one tandem dump truck load. Many bulk suppliers use a similar minimum or charge extra below it.

Usually not: delivery means the truck dumps a pile. Spreading and grading are separate labor and are often quoted per job.

Your project starts with
the right dirt.

Text us what you need. Quoted in minutes. Delivered in hours.

Text for instant quote

Mon–Sat 7am–5pm · Responses in minutes