Short answer: fill dirt typically costs $5 to $25 per cubic yard, or about $4 to $15 per ton, and a full dump truck load usually lands between $150 and $450 delivered, according to national cost guides such as HomeGuide and Angi. Our own published delivered price starts at $10 per cubic yard in Dallas-Fort Worth and $15 per cubic yard in Denver, with a 10-yard minimum. A 10-yard tandem load of fill in DFW starts at $100.

The range is wide because "fill dirt" covers everything from unscreened pit run to tested select fill, and because the biggest single cost is usually trucking, not dirt. The rest of this guide breaks the number down by unit, explains what moves it, and shows how to turn a project size into a budget.

How much does fill dirt cost per cubic yard?

Most residential buyers pay somewhere between $5 and $25 per cubic yard, depending on the grade of fill and whether delivery is included in the quote. Material-only pit prices sit at the bottom of that range. Delivered prices for small orders sit at the top.

Fill typeTypical national range (per yd³)Our delivered starting price, DFWOur delivered starting price, Denver
Common fill dirt$5–$25$10/yd$15/yd
Structural fill$10–$30$20/yd$25/yd
Select fill$10–$30$20/yd$25/yd
Screened topsoil (for comparison)$10–$50$17/yd$22/yd

National ranges are typical market figures reported by third-party cost guides, not our prices. Our figures are published starting prices with delivery included in the per-yard number. For state-level detail, see fill dirt cost in Texas and fill dirt cost in Colorado.

How much does fill dirt cost per ton?

Fill dirt weighs roughly 1.1 to 1.3 tons per cubic yard when dry (about 2,000 to 2,600 lbs). Our calculators use 1.2 tons per yard. That means per-ton and per-yard prices are close but not identical: divide the per-yard price by about 1.2 to get a per-ton price.

Price per yardApproximate price per ton (at 1.2 t/yd)
$5/ydabout $4.20/ton
$10/ydabout $8.30/ton
$15/ydabout $12.50/ton
$20/ydabout $16.70/ton
$25/ydabout $20.80/ton

Wet dirt weighs more, so if a supplier sells by the ton after a rain, you pay for water. Buying by the cubic yard avoids that. If you have a tonnage spec from an engineer or a scale ticket, convert it with the tons to cubic yards calculator.

How much is a truckload of fill dirt?

A delivered dump truck load of fill typically runs $150 to $450 nationally. The total depends on the truck size and the per-yard price. Here are full-load totals at our published DFW and Denver starting prices:

TruckCapacityFill dirt, DFW ($10/yd)Fill dirt, Denver ($15/yd)Approx. weight
Tandem dump truck10 yd³$100$150about 12 tons
Tri-axle dump truck16 yd³$160$240about 19 tons
End dump18 yd³$180$270about 22 tons

See dump truck load sizes for what each truck needs in terms of access and turning room, and how much a dump truck load of dirt costs for totals on topsoil, sand and gravel too.

What drives the price of fill dirt?

1. Delivery distance

Trucking is usually the largest part of a delivered price. A truck and driver cost the same per hour whether they carry fill or gravel, so a load that has to travel 40 miles costs more to deliver than one hauled 10 miles. Many suppliers add a separate delivery fee per trip; national guides typically report $50 to $150 per trip. Our published prices fold delivery into the per-yard number, so compare quotes on a delivered basis.

2. Material grade

Unscreened fill is the cheapest. Screened fill, structural fill and select fill cost more because they are processed or tested to meet a spec. Buy the grade the job needs: common fill for grade raises and low spots, structural or select fill when something will be built on it and the soils report specifies it.

3. Quantity

Per-yard prices fall as quantity rises, mostly because the trucking cost is spread across more yards. Ordering 3 yards from a supplier with a 10-yard minimum means you pay for a trip that is mostly empty. Ordering full truckloads is the simplest way to keep the per-yard number low.

4. Site access

A truck that can back straight in and dump in one spot is fast. A tight street, soft ground, overhead lines or a long walk to the dump spot all slow the truck down or force a smaller truck, and time is money for the hauler. Read how to prepare for delivery before your truck is scheduled.

5. Spreading and compaction

Delivery means dumping in a pile. Spreading, grading and compacting are separate labor. National guides typically put rough spreading at $200 to $400 for a residential job, and larger grading work is quoted per job. If you need it done, see our grading and site preparation services, which we quote per job from your plans.

How do I estimate the total cost of my fill dirt project?

Measure length, width and average depth in feet, multiply, divide by 27 to get cubic yards, then add 10 to 20% for compaction. Then multiply by the delivered per-yard price.

Example: a 30 ft by 20 ft low area that needs 8 inches of fill. 30 × 20 × 0.67 = 402 cubic feet. 402 ÷ 27 = 14.9 yards. Add 15% for compaction: about 17 yards. At a starting price of $10 per yard in DFW, that is roughly $170 to $180 delivered, which fits in one 18-yard end dump load.

The fill dirt calculator runs this math and shows a delivered price. For any shape, the cubic yards calculator gives volume only. If you are still working out quantity, start with how much fill dirt do I need.

AreaDepthCubic yards (before compaction)
324 ft²1"1 yd³
108 ft²3"1 yd³
81 ft²4"1 yd³
54 ft²6"1 yd³

Is cheap fill dirt worth it?

Cheap is fine if the fill is clean. The real cost of bad fill shows up later: buried concrete and debris that settle, trash that has to be dug back out, or heavy clay that holds water against a foundation. Ask what the material is, where it came from, and whether it is screened. For a full checklist, read how to vet a fill dirt delivery company, and for the free route, the cheapest way to get fill dirt.

Fill dirt cost by project type

Most fill jobs fall into a few common sizes. These estimates use typical depths, 15% added for compaction, and our DFW starting price of $10 per yard. Denver runs $5 per yard more. Your own measurements will differ, so treat this as a sanity check, not a quote.

ProjectTypical size and depthApprox. yardsDelivered at $10/yd (DFW)
Fill a low spot in a yard20 × 20 ft, 6" avg8–9 (10-yd minimum)$100
Raise a side yard for drainage60 × 15 ft, 6" avgabout 19about $190
Backfill around a new foundationVaries by dig20–60$200–$600
Fill an in-ground pool after demolitionTypical residential pool60–150+$600–$1,500+
Raise a lot or pad areaVaries100+Text for a volume quote

Pool fills and building pads usually need more than common fill. A pool fill under a future structure, and any building pad, should follow the soils report and the engineer's compaction spec, which may require select fill placed in compacted lifts. If you need the pad built, our building pads service is quoted per job from your plans.

Common budgeting mistakes

  • Forgetting compaction. Loose fill settles 10 to 20% or more when compacted. Order for the compacted volume, not the loose volume.
  • Buying topsoil for the whole depth. Use fill for the bulk of the raise and screened topsoil only for the top 4 to 6 inches where grass grows.
  • Comparing per-ton and per-yard prices directly. Convert first. A per-ton price looks lower than the same per-yard price because a yard weighs more than a ton.
  • Ignoring the delivery line. A low pit price plus a trip fee can beat or lose to a delivered price. Always total it.
  • Ordering partial loads. Round up to a full truck so you are not paying for unused capacity.

Get a delivered price

Run your numbers in the fill dirt calculator, then text your address and yardage. In DFW and Texas, text (469) 253-2403. In Denver, text (720) 577-5016. Fill dirt starts at $10 per yard delivered in DFW and $15 per yard in Denver, 10-yard minimum.

Need Fill Dirt Delivered?

Text us your project details for a quote in minutes.

Text for Instant Quote

Frequently Asked Questions

Fill dirt typically costs $5 to $25 per cubic yard nationally, depending on grade and whether delivery is included. Our delivered price starts at $10 per yard in DFW and $15 per yard in Denver.

Fill dirt typically runs about $4 to $15 per ton. A cubic yard weighs roughly 1.1 to 1.3 tons dry, so divide a per-yard price by about 1.2 to estimate the per-ton price.

A delivered dump truck load of fill typically costs $150 to $450 nationally. At our starting prices, a 10-yard tandem load is $100 in DFW and $150 in Denver.

Often it is not: many suppliers quote material at the pit and add a delivery fee that national guides put at about $50 to $150 per trip. Our published per-yard prices include delivery, so compare quotes on a delivered basis.

Our minimum order is 10 cubic yards, which is one tandem dump truck load. Many bulk suppliers set a similar minimum or charge extra for partial loads.

Your project starts with
the right dirt.

Text us what you need. Quoted in minutes. Delivered in hours.

Text for instant quote

Mon–Sat 7am–5pm · Responses in minutes