Excavation typically costs about $2.50–$15 per cubic yard for straightforward digging, or $100–$300 per hour for an excavator with an operator, according to HomeGuide's national cost data. Rock excavation runs far higher, roughly $50–$200 per cubic yard. Hauling the spoil away is often priced separately and can cost more than the digging itself. These are typical market ranges; we quote excavation per job.
How Much Does Excavation Cost per Cubic Yard?
| Pricing basis | Typical market range | Notes |
|---|---|---|
| Open digging, per cubic yard | $2.50–$15 | Soil type, depth and access move it |
| Small residential digs, per cubic yard | Can reach $50–$200 | Tight access, hand work, small volume |
| Excavator plus operator, per hour | $100–$300 | Larger machines at the top end |
| Rock excavation, per cubic yard | $50–$200 | Breaker or ripper work |
| Large pond digging, per cubic yard | $1.50–$3.50 | Big open volume, spoil kept on site |
| Contractor minimum job | About $500–$800 | Covers mobilization |
Sources: HomeGuide (per-yard, hourly, rock and minimums), Bob Vila (small residential per-yard), HomeAdvisor (pond per-yard). Per-yard rates are much lower on big open jobs because the machine spends its time digging instead of repositioning.
Per Yard or per Hour: Which Is Better?
Hourly pricing suits small, uncertain jobs: a storm shelter hole, a footing trench, or digging where nobody knows what is under the surface. Per-yard or lump-sum pricing suits jobs with clear plans and a measurable volume, like a basement or a pond. On a lump-sum bid, ask what happens if the crew hits rock, because that clause is where surprise costs come from.
How Much Dirt Comes Out of Common Digs?
Volume is length × width × depth ÷ 27. Excavated soil also swells once it is loosened, typically somewhere around 20–30% for common soils, so there are more truck yards to haul than bank yards in the ground.
| Project | Example dimensions | In-ground volume |
|---|---|---|
| Basement with working room | 34 × 44 ft, 9 ft deep | About 499 yd³ |
| In-ground pool | 16 × 32 ft, 5 ft average depth | About 95 yd³ plus over-dig |
| Below-ground storm shelter | 8 × 12 ft, 7 ft deep | About 25 yd³ |
| Quarter-acre farm pond | 10,890 sq ft, 6 ft average depth | About 2,420 yd³ |
Check your own dimensions with the cubic yard calculator.
Basement, Pool and Pond Excavation
Basements and storm shelters
Full basements are uncommon in DFW. Expansive clay, shallow limestone in many areas, and the cost of waterproofing push most homes onto slabs. Below-ground storm shelters and garage shelters are common, though, and they are small, deep digs that usually price by the hour or as a lump sum. Shoring and engineered walls are designed by others; the excavation crew digs to those plans.
Pools
Pool digs are usually arranged through the pool builder. The big variable is spoil: a 95-yard pool hole becomes well over 100 truck yards once loosened, and that dirt has to go somewhere.
Ponds and stock tanks
Pond excavation is among the cheapest per yard because the dirt usually stays on site as the dam or embankment, or is spread nearby. Angi cites roughly $2,000–$25,000 per acre for plain farm and fishing ponds, a wide range driven by depth, soil and whether the clay will hold water. Commercial stormwater ponds are a different job, built to engineered plans; see what is a detention pond.
What Does It Cost to Haul Off Excavated Dirt?
Spoil disposal is the line item that most often doubles an excavation budget. Ranges differ widely depending on what is included:
- Within a larger excavation job, Angi has cited hauling at about $8–$25 per cubic yard.
- Standalone haul-off of clean dirt is usually priced per yard or per truckload. Ours starts at $15 per yard in DFW (10-yard minimum), and clean fill can often go to a free dump site instead.
The cheapest outcome is usually reuse: backfill on the same site, grading, or sending clean dirt to a nearby job that needs fill instead of paying a landfill. Our dirt hauling crews route clean export to DFW jobs that need it, and the free dump sites page lists places that take clean fill.
What Drives Excavation Cost?
- Soil and rock. DFW black clay digs easily when moist and fights back when bone dry. Limestone shelves under the clay, common on the west side of Dallas and around Fort Worth, can turn a routine dig into breaker work.
- Depth and shoring. Deeper digs need benching, sloping or trench protection, which adds volume and time.
- Access. A full-size excavator and dump trucks work fastest. Backyard digs through a gate need smaller machines.
- Water. Groundwater or a rain-filled hole means pumping and waiting.
- Utilities. Texas law requires an 811 locate request before digging, and digging near marked lines slows down to hand-dig speed.
- Spoil plan. Keep it on site, export it to reuse, or pay disposal.