How it's calculated
- Bed area = beds × length × width (feet).
- Topsoil = bed area × topsoil depth (in ÷ 12); fill dirt = bed area × the remaining depth.
- Divide by 27 for cubic yards and add 10% because soil settles after watering.
Common sizes
| Project | Screened topsoil (yd³) | Fill dirt (yd³) |
|---|---|---|
| One 4 × 8 bed, 12 in deep | 2 | – |
| Four 4 × 8 beds, 18 in deep | 6 | 3 |
| Six 4 × 8 beds, 24 in deep | 8 | 8 |
Yards to order, allowances included, rounded up.
Weight and delivered price per yard
| Material | Tons per yd³ | Yd³ per ton | DFW from | Denver from |
|---|---|---|---|---|
| Screened topsoil | 1.0–1.1 | 0.95 | $17/yd | $22/yd |
| Fill dirt | 1.1–1.3 | 0.83 | $10/yd | $15/yd |
Weights are typical; wet material is heavier. Prices are published starting prices, delivered, 10-yard minimum. Other metros: see your city's service page.
Common questions
How much soil do I need for a 4 × 8 raised bed?
About 1.2 cubic yards (32 cubic feet) at 12 inches deep, or 1.8 yards at 18 inches, before a 10% allowance for settling.
What should go in the bottom of a raised bed?
Below the root zone, plain fill dirt works and costs far less than topsoil. Most vegetable roots stay in the top 12 inches.
Is it cheaper to buy raised bed soil in bags?
For one small bed, maybe. Four 4 × 8 beds 18 inches deep need about 212 one-cubic-foot bags; bulk delivery is far cheaper at that size.
How much does soil settle in a raised bed?
Typically 10–20% in the first season as it is watered. Top up with an inch or two of topsoil each spring.