See today’s confirmed same-day availability, or text (469) 253-2403 for instant pricing
Fill Dirt Near Me

Retaining Wall Backfill Calculator

Drainage stone = wall length × height × the width of the drainage zone (typically 12 inches). A 40 ft wall 3 ft tall needs about 4.7 cubic yards of #57 stone behind it, plus about 1.7 yards of road base for a 24 × 6 inch leveling pad, allowances included.

What to order

  • #57 stone5 yd³

    Drainage stone behind the wall. Includes 5% allowance · ≈7 tons · 1 tandem load

    10 yd × $25/yd = $250 (10-yd minimum)

  • Road base / flex base2 yd³

    Compacted leveling pad under the first course. Includes 15% allowance · ≈3.1 tons · 1 tandem load

    10 yd × $25/yd = $250 (10-yd minimum)

Wall face
120 sq ft
Drain pipe at the base
40 ft (4 in perforated)

Delivered price in your city

Materials delivered, starting at$500

Published starting prices; each material is a separate load with a 10-yard minimum. Dispatch confirms with your address. Spreading and compaction are not included.

or text (469) 253-2403

How it's calculated

  1. Drainage zone = wall length × total wall height (including buried courses) × zone width (12 in is typical for segmental block walls).
  2. Leveling pad = wall length × pad width × pad depth (often 24 in wide and 6 in deep of compacted base).
  3. Divide each by 27; add 5% for clean stone and 15% for road base. Follow the block manufacturer and, for taller walls, the engineer.

Common sizes

Project#57 stone (yd³)Road base / flex base (yd³)
20 ft wall, 2 ft tall21
40 ft wall, 3 ft tall52
60 ft wall, 4 ft tall103

Yards to order, allowances included, rounded up.

Weight and delivered price per yard

MaterialTons per yd³Yd³ per tonDFW fromDenver from
#57 stone1.35–1.450.71$25/yd$30/yd
Road base / flex base1.5–1.60.65$25/yd$30/yd

Weights are typical; wet material is heavier. Prices are published starting prices, delivered, 10-yard minimum. Other metros: see your city's service page.

Common questions

What is the best backfill for a retaining wall?

Clean #57 stone in the first 12 inches behind the wall, with a perforated drain pipe at the base, then compacted soil beyond that. Clay right against the wall traps water and pushes it over.

How much gravel behind a retaining wall?

About 1 cubic yard per 27 sq ft of wall face for a 12-inch zone. A 40 × 3 ft wall takes roughly 4.7 yards with allowance.

What goes under a retaining wall?

A compacted leveling pad of road base, typically 6 inches deep and about twice the block depth wide, with the first course partly buried.

Do retaining walls need an engineer?

Many cities require engineered plans above about 4 ft of exposed height or when the wall holds back a slope, driveway or structure. Check your local code.

Related guides

More calculators

Not sure what to order?

Text your measurements and a photo of the area. We'll tell you the material, the yards, and the delivered price. DFW: text (469) 253-2403 · Denver: text (720) 577-5016.

Your project starts with
the right dirt.

Text us what you need. Quoted in minutes. Delivered in hours.

Text for instant quote

Mon–Sat 7am–5pm · Responses in minutes